HOW TO USE
• Pour Liquid into a container Add 10% of water(i.e 3ltrs for 20kg pack, 1ltrs for 7kg pack)
and mix slowly with slow speed drill
• Add water to the above mix in small quantities to the obtain smooth and uniform paste.
• On wet surface apply with brush or roller. Keep stirring the mixed material to avoid
setting.
• Apply second coat after 4-6 hours.
For protection against Physical damage a motor screed may be provided.
visit https://www.oberwaterproofing.com for more info